Coffs Harbour Bypass
Nylige bulletiner
  • 21st mai 2025, North Boambee office CLOSED

    All,

    The CHB Team office located at North Boambee Road is closed for the day. Please do not try to access the site.

  • 03rd april 2025, CHB 04/04 Site Induction Cancelled

    Good afternoon,

    This email is to let you know that due to the low number of requests that we have received, tomorrow's site induction has been cancelled.

    Our next session will be Monday 07/04. Don't forget to send your requests through safety@chbteam.com.au

    Kind Regards,

    Safety Team.

  • 30th september 2024, Safety alert - Action required

    All Contractors,

    On Wednesday the project had a serious safety incident where a hiab rolled onto its side during unloading. Luckily no one was injured.

    There were a number of causational factors, however the incident was easily avoidable through scheduling of the delivery and notifying the supervisor prior to arrival.

    Please make sure any deliveries follow the project requirements set out below;

    - Deliveries must be scheduled prior with the relevant accepting supervisor and/or engineer
    - All deliveries must report direct to the area supervisor upon arrival
    - All delivery drivers must either be project inducted or complete a delivery driver induction upon arrival
    - All unloading of materials must be done in line with project safety requirements as directed by the area supervisor
    - Anyone accessing site must wear the required PPE and always follow all site requirements
    - No unloading or lifting without approval from the area supervisor
    - Any frequently used plant and light vehicles onsite must be site approved through the Hammertech equipment portal and display the associated project plant ID number.

    Can you please toolbox the safety alert and above message to your workforce and supply completed toolbox copies to tpalencia@chbteam.com.au by the 15th of October.

    If you have any questions, please contact Project Safety Manager on 0477 925 362.

    Tillegg :
    2024 09 25 Safety Alert - Hiab truck roll over.pdf
Nettstedets værmelding
Vær på anleggsted

Sist oppdatert kl.: 20:31
Temperatur: 18C (App 16C)
Vindfart: 19KMH
Maks. Vind: 41KMH @17:21
Regn side 09.00: 0,4mm
Min. temperatur: 16C @03:09
Maks. temperatur: 24C @12:23 22.04.2026
Vindkast: 26KMH
Maks. vindkast: 52KMH @17:21


Observasjon hentet fra - Bureau of Meteorology
Observasjonssted - Coffs Harbour Airport, NEW SOUTH WALES
Tidssone - austaustralsk standardtid
Værmelding – torsdag, 23 april

Showers.
Min.: 15C Maks.: 23C
Sjanse for regn: 90%
Forventet nedbør: 1 til 20mm


Værmelding hentet fra – Bureau of Meteorology
Sted for værmelding – Coffs Harbour, NEW SOUTH WALES
Tidssone - austaustralsk standardtid
I morgen - fredag, 24 april

Showers.
Min.: 16C Maks.: 22C
Sjanse for regn: 90%
Forventet nedbør: 3 til 25mm


Viktige dokumenter for anleggsplassen
Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering

Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Ny på anleggsplassen?

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering