Coffs Harbour Bypass
Últimos Boletines
  • 21st mayo 2025, North Boambee office CLOSED

    All,

    The CHB Team office located at North Boambee Road is closed for the day. Please do not try to access the site.

  • 03rd abril 2025, CHB 04/04 Site Induction Cancelled

    Good afternoon,

    This email is to let you know that due to the low number of requests that we have received, tomorrow's site induction has been cancelled.

    Our next session will be Monday 07/04. Don't forget to send your requests through safety@chbteam.com.au

    Kind Regards,

    Safety Team.

  • 30th septiembre 2024, Safety alert - Action required

    All Contractors,

    On Wednesday the project had a serious safety incident where a hiab rolled onto its side during unloading. Luckily no one was injured.

    There were a number of causational factors, however the incident was easily avoidable through scheduling of the delivery and notifying the supervisor prior to arrival.

    Please make sure any deliveries follow the project requirements set out below;

    - Deliveries must be scheduled prior with the relevant accepting supervisor and/or engineer
    - All deliveries must report direct to the area supervisor upon arrival
    - All delivery drivers must either be project inducted or complete a delivery driver induction upon arrival
    - All unloading of materials must be done in line with project safety requirements as directed by the area supervisor
    - Anyone accessing site must wear the required PPE and always follow all site requirements
    - No unloading or lifting without approval from the area supervisor
    - Any frequently used plant and light vehicles onsite must be site approved through the Hammertech equipment portal and display the associated project plant ID number.

    Can you please toolbox the safety alert and above message to your workforce and supply completed toolbox copies to tpalencia@chbteam.com.au by the 15th of October.

    If you have any questions, please contact Project Safety Manager on 0477 925 362.

    Archivos adjuntos :
    2024 09 25 Safety Alert - Hiab truck roll over.pdf
Pronóstico del tiempo para la Obra
Tiempo en Obra actual

Última actualización el: 8:31 PM
Temperatura: 18C (Aplicación 16C)
Velocidad del viento: 19MPH
Máx. Viento: 41MPH @5:21 PM
Lluvia desde las 9 a.m.: 0.4mm
Temp mín: 16C @3:09 AM
Temp máx: 24C @12:23 PM 4/22/2026
Ráfaga: 26MPH
Ráfagas máx: 52MPH @5:21 PM


Observación obtenida de - Bureau of Meteorology
Lugar de observación - Coffs Harbour Airport, NEW SOUTH WALES
Zona horaria - hora estándar de Australia oriental
Pronóstico - jueves, 23 abril

Showers.
Mín: 15C Máx: 23C
Probabilidad de lluvia: 90%
Se esperan precipitaciones: 1 para 20mm


Pronóstico obtenido de - Bureau of Meteorology
Lugar de la previsión - Coffs Harbour, NEW SOUTH WALES
Zona horaria - hora estándar de Australia oriental
Mañana - viernes, 24 abril

Showers.
Mín: 16C Máx: 22C
Probabilidad de lluvia: 90%
Se esperan precipitaciones: 3 para 25mm


Documentos importantes de la Obra
¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro

¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

¿Primera vez en la Obra?

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro